AstreaIoT · sensors that alert you on WhatsApp when something on your site goes out of range

For shopping centers and rental buildings · water · LP gas · chilled water · power

the cistern, the night-time leak and each unit’s consumption:
what you split by square meter today, measured.

Today water, gas and power arrive on one bill in the center’s name and get split by square meter. AstreaIoT watches the cistern and the rooftop tanks, alerts you to water moving at night and measures each unit’s consumption from its meter, so your center splits what it already pays with data.

cistern64%water · unit 70.0L/minpower · unit 3412kWhmachine roomclosedsample readings, as your team sees them
Illustration: a shopping center's cistern, cut open, with the water and a level sensor; a pump sends the water through a pipe to three branches, one per shop, each with its valve and its meter. Shop 2's meter has a pulse transmitter; a gateway on the wall receives the sample reading by radio.Illustration: a shopping center's cistern, cut open, with the water and a level sensor; a pump sends the water through a pipe to three branches, one per shop, each with its valve and its meter. Shop 2's meter has a pulse transmitter; a gateway on the wall receives the sample reading by radio.
the cistern, the pump and one meter per unit; unit 2’s meter sends its reading to the gateway.
18 %
example · cistern level, 6:40 a.m.

the cistern that does not refill

The units without water, and the complaint arrives before the alert that the pump did not restore the level.

0.4 L/min
example · 3:12 a.m., center closed

the night-time leak

Water moving at the hour of lowest use, night after night, that no bill explains.

41 m³ · 6 m³
example · water this month, same m²

the split by square meter

The empty unit and the office pay part of the restaurant’s water and power, and the center absorbs the difference.

water first, then gas, chilled water and power.

Water is the way in: it is what gets lost most without anyone seeing it. Gas, chilled water and each unit’s power come next, on the same gateway. You decide what gets split and how; the platform gives you each unit’s consumption.

water

first
18 %cistern level, 6:40 a.m. · example
Ver como tabla
Cistern level from 7:00 to 6:40 the next day. It rises after each pumping and, from the afternoon on, stops recovering until it sits at 18 %, under the 20 % mark. Example data.
DayMinimum
mar 15 sep30 %
mié 16 sep18 %
the cistern over 24 hours: from 7 p.m. on it no longer recovers · example
0.4 L/min · 3:12 a.m.water with the center closed · example
14.2 m³ · unit 7this month · example
water this month per unit · example
  • unit 18.1 m³
  • unit 219.3 m³
  • unit 35.2 m³
  • unit 40.4 m³
  • unit 511.0 m³
  • unit 66.3 m³
  • unit 714.2 m³
  • unit 83.9 m³

Cistern and rooftop tank level with a level sensor on the lid. Water moving with the center closed, night after night: the slow leak. And each unit’s consumption from its meter: we read the pulse output of the meter already installed and, if it has none, we put one next to it.

LP gas

next
18.4 m³gas · unit 7 · example

The consumption of each gas meter, read from its pulse output and totaled: how much gas went through each unit’s kitchen this month.

per project: additional meters

chilled water

next
27.6 m³chilled water · unit 5 · example

When the center’s chiller cools several units, each one’s consumption from the meter on its line, if the meter has an output.

per project: thermal energy with a certified meter

power per unit, at cost

next
412 kWhpower · unit 3 · example

Each unit’s kWh from the meter at the panel, to split the CFE bill the center already pays. It is splitting the bill, not selling energy: the CFE meter is still the one that bills, and its seals are never touched.

point by point

four places in your center, one screen.

From the pump room to the machine room door: each place with what is watched and who gets the alert. Hover or tap a number.

Isometric cutaway plan of an example shopping plaza, walls cut low. At the back, eight shops in a row, each with its water meter by the storefront; shop 2's has water running. In the middle, the corridor. In front, the pump room with the open cistern, two pumps and, above it, the roof tanks on a piece of the roof; the machine room with the chiller and a door with a contact; the panel room with one meter per shop and the gateway on the wall. On the sidewalk, the main meter. Four numbers mark what is watched: 1 cistern and tanks, 2 the meters, 3 the panel, 4 the leak detectors and the door.Isometric cutaway plan of an example shopping plaza, walls cut low. At the back, eight shops in a row, each with its water meter by the storefront; shop 2's has water running. In the middle, the corridor. In front, the pump room with the open cistern, two pumps and, above it, the roof tanks on a piece of the roof; the machine room with the chiller and a door with a contact; the panel room with one meter per shop and the gateway on the wall. On the sidewalk, the main meter. Four numbers mark what is watched: 1 cistern and tanks, 2 the meters, 3 the panel, 4 the leak detectors and the door.

example center · unit 2’s meter is the one in the night that follows

hover a row · click to pin it · esc to let go

what goes on each piece of equipment

each sensor goes on equipment you already have.

Five pieces of equipment your center already has and where the sensor goes on each. All of them go on the outside: no equipment is replaced.

  • watercistern

    measures: the water level every 10 minutes.

    installed: above the water, without touching the wall or the pump.

  • water · gasunit meter

    measures: what each unit uses, with its monthly total.

    installed: on the meter it already has, without cutting the water.

  • powerelectrical panel

    measures: the energy entering the panel, phase by phase.

    installed: clamped around the cables, without cutting them.

  • chilled waterrooftop chiller

    measures: the temperature of the chilled water going out to the center.

    installed: on the outside of the pipe, without opening it.

  • networkgateway

    measures: it does not measure; it gathers every sensor’s readings and sends them to the dashboard.

    installed: on a high wall or on the roof, with power and signal.

One night at the center, with sample data

one night in your center.

With example data: one meter, a slow leak and the alert that arrives before the units open.

  1. 3:12 a.m.

    Unit 2’s meter keeps turning with the center closed.

    With the center closed, night-time consumption should be zero. If the meter shows water at the hour of lowest use, night after night, it is a slow leak.

    wateroutside the allowedallowed with the center closedtime at each flow (right)
    Minimum0.0 L/minmar 15 · 23:06
    Maximum0.4 L/minoutmié 16 · 04:36
    Outside the allowed3 h 24 min1 excursion · mié 16
    Ver como tabla
    Water use of unit 2’s meter between 23:00 and 6:30: at zero until 3:12 a.m., then 0.4 litres per minute without dropping. Example data.
    NightMinimumMaximumOutside the allowed
    mar 15 sep0.0 L/min0.0 L/min—
    mié 16 sep0.0 L/min0.4 L/min3 h 24 min
    Unit 2’s meter water, from 23:00 to 6:30. Example.
  2. 3:40 a.m.

    The alert reaches WhatsApp: water running in unit 2 with the center closed.

    It says which meter and since when. It reaches whoever runs the center, before the units open.

    The alert as it reaches the phone. Example.
  3. 3:52 a.m.

    The maintenance lead acknowledges it from the app.

    The same alert in the app, with the diagnosis and what to do. Whatever is done is logged with its time and who did it, until it is closed.

    The alert in the app of whoever runs the center. Example.
  4. 8:41 a.m.

    Unit 2’s valve is closed and the meter goes back to zero.

    The change shows on the same screen, and what happened stays in the meter’s day-by-day record, the one that goes into the unit’s statement.

    unit 2 · water0.0 L/min
    00.4valve closed · 8:416:009:30
    The same meter in the morning. Example.

what you see before the bill arrives.

for whoever runs the center.

The site manager and the maintenance lead. What today you learn from a tenant’s complaint arrives as an alert with the place and the time.

20 %18:0006:40
cistern · 18:00 to 6:40, does not recover · example

The pump did not refill the cistern overnight.

The level sensor sees the cistern not rising after pumping and alerts on WhatsApp before the units open, so your team checks the pump.

place 1 · cistern
3:1223:0006:30
unit 2 · L/min, 23:00 to 6:30 · example

Water moving at three in the morning with the center closed.

With the center closed, night-time consumption should be zero. If the meter shows water at the hour of lowest use, night after night, it is a slow leak: the alert says which meter and since when.

place 2 · meters

The machine room floor gets wet on a Sunday.

The floor leak detector alerts the maintenance lead as soon as there is water, even if nobody walks in until Monday.

place 4 · rooms

The machine room door opens at night.

The door contact logs every opening with its time and alerts if it is after hours.

place 4 · rooms

for whoever splits the bill.

The center’s administration and billing team. The bill arrives in the center’s name; today it is split among units by square meter.

AprSep
unit 4 · m³ per month, 6 months · example

The empty unit pays for water and power it does not use.

With each unit’s consumption from its meter, the bill is split by what each one used: the empty unit stops carrying the restaurant’s share.

officerestaurant
water this month, same m² · office 6 m³, restaurant 41 m³ · example

The restaurant uses more water than the office next door and pays the same.

Each unit’s consumption, month over month and against its own history. The difference shows on the screen and on the statement, not in an argument.

A unit’s kitchen and the gas truck’s invoice.

The pulse of each kitchen’s gas meter, totaled over the month: gas is split by what went through each meter.

The center’s chiller cools a restaurant and nobody measures it.

The chilled-water meter on the unit’s line, read from its output: the split by what went through. If thermal energy with a certified meter is needed, it is per project.

What the main meter shows and no unit explains.

The main meter minus the sum of the units: the common-area remainder, on its own line of the statement, so it is not split blindly.

each unit’s water, in order.

Each unit’s consumption this month, from most to least. Example.

water this month per unit · example
Water this month per unit, example data
#Unitm³m³against last monthlast 6 months
1unit 2
19.3 m³▲ 2
2unit 7
14.2 m³▼ 1
3unit 5
11.0 m³▼ 1
4unit 1
8.1 m³=
5unit 6
6.3 m³▲ 1
6unit 3
5.2 m³▼ 1
7unit 8
3.9 m³=
8unit 4
0.4 m³=

the statement, every month.

A monthly statement per unit, with its water, gas, chilled water and power consumption. Your center reviews it and sends it; the remainder goes on its own line. We measure; the center is the one that bills the tenant.

  • The month-end close.

    The platform builds a statement per unit with the period’s consumption. Your team reviews it, approves it and sends it to each tenant.

  • A tenant asks why their consumption went up.

    The statement comes from their meter’s day-by-day record: you answer with their own curve.

example
statementunit 7
period1 – 30 Sepdays30readingsday by day
serviceconsumption
waterunit 7 meter14.2 m³
LP gaskitchen meter18.4 m³
chilled waterits line’s meter9.6 m³
powerpanel meter1,284 kWh
common-area remaindermain meter minus the sum of the units2.1 m³ · 96 kWh
water, day by day · its own curve
SeptemberAugust
Ver como tabla
Unit 7’s water day by day in the period. Example data.
DaySeptemberAugust
10.45 m³0.52 m³
20.51 m³0.55 m³
30.48 m³0.50 m³
40.60 m³0.63 m³
50.58 m³0.61 m³
60.75 m³0.70 m³
70.69 m³0.66 m³
80.39 m³0.44 m³
90.34 m³0.40 m³
100.27 m³0.33 m³
110.32 m³0.36 m³
120.27 m³0.31 m³
130.50 m³0.54 m³
140.57 m³0.60 m³
150.44 m³0.49 m³
160.51 m³0.55 m³
170.50 m³0.53 m³
180.49 m³0.52 m³
190.48 m³0.50 m³
200.61 m³0.66 m³
210.59 m³0.62 m³
220.31 m³0.36 m³
230.37 m³0.40 m³
240.32 m³0.35 m³
250.28 m³0.33 m³
260.33 m³0.38 m³
270.57 m³0.60 m³
280.64 m³0.67 m³
290.47 m³0.51 m³
300.59 m³0.62 m³
reviewed by the center · to sendyour center sends it

one site, sixty days.

  1. one site

    chosen

    The center or building where it hurts most: the cistern that runs dry, the bill nobody understands or the split that starts arguments.

  2. site survey

    what is watched

    What is watched and where, with the bill in hand and the main panel located: how many units, which meters have an output and which need one next to them.

  3. installation

    2–7 days per site

    A level sensor on the cistern and rooftop tanks, readings from each unit’s meters, detectors in the machine rooms and the gateway. No civil works: where a meter has no output, the new one goes on the same line. You see it on screen before we leave.

  4. sixty days

    report and close

    The site watched from day one, the day-by-day baseline and two monthly reports. With that you decide the next site.

To start, the center needs its bill, the main panel located, a technical contact and one for the alerts, and a spot with power and cellular signal for the gateway.
The rule: splitting is not reselling. Selling kWh or m³ is a regulated activity; we measure and your center splits, at cost, what it already pays. The CFE and water-utility meters are still the ones that bill, and their seals are never touched.

who we are.

AstreaIoT is the monitoring platform of Astrea Technologies, an engineering and software company in Monterrey since 2018. The sensor network is ours, we build the platform and the app, and the hardware comes from manufacturers we work with directly. We install in northern Mexico with our own team and in the rest of the country with partner integrators.

common questions before the quote.

Is this reselling power or water to my tenants?

No. It is splitting, at cost, the bill the center already pays, by what each unit used. Selling kWh or m³ is a regulated activity: we measure and your center splits.

Do the units’ meters have to be replaced?

Not always. Where the meter already has a pulse output, we read that one. Where it does not, we put one next to it. The site survey says which is which before the quote.

Is the CFE meter touched?

No. The CFE meter is the one that bills and its seals are never touched. We measure on the center’s side, at the panel, to split the bill among the units.

Who sends each unit its statement?

Your center. The platform builds the monthly statement per unit; your team reviews it and sends it. We do not bill your tenants.

And the cistern level?

It comes in from the first site: a level sensor on the lid of the cistern and the rooftop tanks.

What happens if the center loses internet?

The gateway stores the readings while there is no connection and uploads them when it comes back. The sensors keep recording and everything syncs on reconnect.

the next bill is already split with data.

Thirty minutes. You tell us how many units your center has, which services you split today and how. We propose the first site and what gets watched in its sixty days.

Request a quote

see all industries