5+ simultaneous sites

five or more sites watched · one executive dashboard · no more field supervisors.

A mid-market builder with 5 to 20 active sites loses visibility when they hire the seventh supervisor. Sites get robbed or accidents happen precisely when the supervisor is not there. After-hours intrusion in shed and office, alert if the generator does not take load, dormitory STPS, finish-area leaks, mess-hall cold chain — one dashboard for all your sites alerts you exactly when the supervisor is not there.

what's at stake
equipment theft$30-80K MXN (illustrative example) per event + project delay
generator down$15-40K MXN (illustrative example) per non-working day on blackout
finish leak$50-200K MXN (illustrative example) product + delivery delay
four critical zones · continuous per-site monitoring

four zones · replicated per active site.

Each mid-market site has the same four risks: nighttime site security, energy and generator, worker conditions (STPS), mess-hall cold chain and finish-area leaks. One platform replicated per site, executive cross-site dashboard.

01

nighttime site security

Motion sensor for indoor after-hours intrusion (equipment shed, field office) + door sensors on critical access + people counter on access. WhatsApp alert to supervisor or local security in minutes. Anti-theft of equipment on weekends and night hours.

02

generator and continuity

Generator current meter + generator-room temperature sensor. You know whether it started, took load and how many hours it ran; it alerts you when the equipment changes its consumption and your team acts.

03

STPS · dormitories and IAQ

Temperature + humidity sensor per worker dormitory + CO₂ / VOC sensor in work zones. Continuous record for your safety lead · worker turnover reduced with documented conditions.

04

mess hall + finishes

Mess-hall refrigerator/walk-in cooler temperature sensor. Leak sensor under critical equipment in finished surfaces (model kitchens, sample bathrooms, freshly installed drywall). Cold chain protected + finishes defended.

Out of scope: construction ERP (Neodata, Opus, SAI) · BIM · crew scheduling. AstreaIoT does not replace them; if your ERP needs site operation data, we integrate through the integration with your systems.

cheap sensors · against five concrete losses

what we protect · what we prevent.

what we protect
  • +Shed and field office watched at night and weekends · WhatsApp alert when someone enters after hours
  • +You know whether the generator took load when power went out · scheduled maintenance
  • +Time-stamped STPS record · the timestamped noise record NOM-011 asks for · worker turnover reduced with decent conditions
  • +Mess-hall cold chain protected · alert in time to save the workers’ food
  • +Fresh finishes defended · leak sensor under every critical equipment before handover
what we prevent
  • ✕Equipment theft $30-80K MXN (illustrative example) per event + progress delay + replacement + insurance claim
  • ✕Generator off on blackout · $15-40K MXN (illustrative example) per non-working day · paid crews not producing
  • ✕STPS fine from undocumented dormitory conditions · builder image damaged
  • ✕Cold chain broken in mess hall · day product lost · workers unfed
  • ✕Finishes destroyed by leak $50-200K MXN (illustrative example) · delivery delayed · client claiming
ten situations · four areas

ten use cases · four critical areas.

for the site manager.

Site Manager + Field Supervisor. Three cases · weekend equipment theft, subcontractor access without reliable record, nighttime vandalism in materials shed. Coverage when the supervisor is not physically there.

#what happenshow we detect itprotected value
01
Equipment stolen from site on weekend
Indoor after-hours motion + door sensors on critical access + WhatsApp alert in minutes
$30-80K MXN (illustrative example) per event avoided · supervisor or security intervenes in time
02
Subcontractors entering without record · hours dispute
Door sensor on access (when it opened and for how long) + bidirectional people counter at entry (how many people)
Access and entry record that can’t be edited · data to reconcile hours with the subcontractor
03
Vandalism or nighttime intrusion in materials shed
PIR sensor + door sensor in shed + immediate alert
Intrusion detected in minutes · materials protected · active security

for the operations director.

Operations Director + Maintenance Lead. Two cases · stand-by generator that won’t start when power goes out, maintenance on critical generator. Fewer lost days from energy.

#what happenshow we detect itprotected value
04
Stand-by generator that won’t start when power goes out
Generator current meter
You know at once if it did not take load · $15-40K MXN (illustrative example) per non-working day avoided
05
Critical generator maintenance by fixed calendar
Current meter · real hours of use and alert when the equipment changes its consumption
Scheduled maintenance · repair at a fraction of emergency cost

for the safety officer.

Safety Officer + HR Lead. Three cases · undocumented STPS in work zones, extreme heat in worker dormitories, inadequate climate in dormitories. Turnover reduced with documented decent conditions.

#what happenshow we detect itprotected value
06
Undocumented STPS in work zones · surprise audit
CO₂ / VOC + temperature + noise sensor per zone · continuous record
The timestamped noise record NOM-011-STPS asks for · audit backed by data · fines avoided
07
Extreme heat in worker dormitories · heat stroke
Per-dorm temperature and humidity sensor with immediate alert to supervisor
Lives · incident avoided · builder image protected
08
Dormitories without adequate climate · worker turnover
Per-dormitory temperature + humidity sensor · thermal-excess alert
Reduced turnover · decent documented conditions · reputation with contractors

for the CFO and field supervisor.

CFO + Field Supervisor. Two cases · broken cold chain in mess-hall walk-in cooler, water leak in finished surfaces before handover. Invisible costs turned into data.

#what happenshow we detect itprotected value
09
Broken cold chain in mess-hall walk-in cooler
Refrigerator temperature + door sensor · immediate alert
Day product protected · site workers fed
10
Water leak destroys finishes before handover
Leak sensor under critical equipment in model kitchens + bathrooms + fresh finishes
$50-200K MXN (illustrative example) avoided · on-time delivery · no client claims
regulations and compliance that apply

three compliances · one platform covers all three.

NOM-011-STPS-2001 + NOM-015
what it requires
Thermal and noise conditions in work zones and worker dormitories · surprise audits with documented log.
how we deliver
CO₂ / VOC + temperature + noise sensor per zone · continuous record for STPS audit · documented compliance.
NOM-002-STPS-2010 · fire prevention
what it requires
The standard asks for toxic-gas detection in dormitories (smoke, CO, LP) and documented prevention and alert systems · the site puts in that detector; we log heat and humidity in the dormitory.
how we deliver
Per-dorm temperature and humidity sensor with remote visibility · immediate alert to supervisor · auditable record. Gas detection belongs to the camp.
Municipal construction code
what it requires
Perimeter security · waste management · per-stage construction permits.
how we deliver
Documented indoor after-hours intrusion · door sensor on access · per-site activity record.

For builders with 10+ simultaneous sites, national dashboard with per-site incident ranking · executive visibility without visiting every site.

>./workflow·how the data travels

from sensor to report · every few minutes · without human intervention

Five steps. They run in parallel across all your sites, all the time. When something crosses a threshold, the flow completes in under five minutes — alert delivered, response logged, inspector-ready evidence captured.

01

measure

Sensors measure temperature, humidity, current, door-open, leak and other magnitudes every few minutes — no operator required.

02

detect

The system compares each reading against the threshold configured per recipe · per site · per equipment. Threshold crossing triggers the flow.

03

alert

The alert routes to the right person via WhatsApp, email or push · per role and schedule configured.

04

respond

The operator acts from the dashboard or mobile app. The corrective action goes into a timestamped log with signature, which can’t be edited.

05

audit

Everything becomes part of the audit package · time series, critical events, corrective actions, NOM report ready in two clicks.

Five steps · no manual operators · no paperwork · no gaps.

five phases · from kickoff to first protected site

five phases · per active site.

01

per-site survey

1 day

Technical visit + inventory of storeroom and office, dormitories, generator, mess hall, finished surfaces · STPS checklist · construction-stage identification.

02

physical installation

2–7 days per site

Sensors mounted on shed + field office + generator + dormitories + mess hall + finish zones · gateway that stores readings while offline and uploads them when the connection returns · designed to move between projects.

03

configuration + calibration

1 day

STPS thresholds + day/night rules · noise sensor with local calibration · WhatsApp alerts configured per role (supervisor, site manager, safety).

04

team training

half day

Site Manager + Field Supervisor + Safety Officer + Maintenance Lead · each role trains on their alert flow.

05

30 days of support + first review

30 days

AstreaIoT specialist available · per-site sensitivity adjustment · first monthly report delivered · cross-site dashboard activated.

Redeployable hardware: sensors are designed to move between projects.

common questions before the quote

common questions · before the quote.

are the sensors designed to move between sites?

Yes · sensors are portable · removed and mounted on the next site. The same equipment serves several sites. No penalty or de-installation fee.

what if the site does not have its own internet?

The gateway is offered with optional cellular backup. Works with field-office WiFi when available (preferred for speed) · or the cellular network, if it has that option. No need to contract per-site internet.

does it integrate with the construction ERP (Neodata, Opus, SAI)?

As a project · through the integration with your systems. Site operation data arrives directly in the ERP. Progress reports, STPS conditions, documented incidents in your central system.

how does the cross-site dashboard work?

Unified dashboard with per-site incident ranking · alerts filtered by severity and role. The regional manager sees their 10 sites · the plant manager only sees theirs · the executive director sees the whole portfolio.

what happens to sensors when a site finishes?

We recover the equipment · no penalty or fee. Sensors move to the next site in hours. Redeployable hardware is the model · not lost CapEx.

do the dorm sensors handle construction dust?

Yes · industrial-grade sensors, compatible with dusty, variable-temperature site dormitories. If a reading looks off, the specialist reviews it with you.

can a site be added mid-project?

Yes · fast onboarding. Site survey in 1–3 days, then installation and configuration in 2–7 days per site. The site integrates with the cross-site dashboard immediately.

what is at stake

executive visibility · without hiring more supervisors.

10+ sites
governable · 2-3 with real problems visible · 7-8 fine without spam

For a mid-market builder with 5-20 simultaneous sites, the cross-site dashboard identifies the two or three with real problems today. You don't have to hire the seventh supervisor to have visibility into the seventh site.

The winning argument is operational scalability: the supervisor costs $20-50K MXN/month (illustrative example) · the sensor pays for itself with one avoided theft per site. Redeployable hardware means the equipment moves to the next site · not lost cost when the site finishes.

One unwatched weekend is material that doesn't come back; the pilot starts at the most exposed site.

the next site · is already watched · from the first shift.

Thirty minutes. You tell us how many active sites you have, what type (residential, commercial, industrial), what worries you most (theft, STPS, generator, finishes). We deliver a per-site quote + rollout plan + clear cost.