COMING · CLUSTER 03 · Q4 2026
>./clientes/construccion·cluster 03 · coming Q4 2026

construction monitoring · coming Q4 2026.

Protect equipment, climate-control field offices, secure generators and worker dormitories. We launch when the D2D AC controller + IFT homologation are ready — Q4 2026 target date.

ONobra · perímetro · 02:14 am● perímetro okgenerador · corriente12.4 A
>./subsegments·I · four operator types

what kind of construction does your team operate?

mid-market builders

Developers running 5+ simultaneous sites. Executive visibility per site without hiring more field supervisors.

residential developments

Multi-family + premium-home in construction. Worker-dorm climate, water, food, generators, perimeter.

hotels under construction

Hotel in build phase through delivery. Cold chain in worker mess + camp climate + nighttime security.

D2D partners + integrators

Installers who spec hardware into projects. Priority partner-access program open for Q4 2026 launch.

>./protegemos·II · what it costs when something fails on site

problems that cost thousands before the project finishes.

what fails on sitethe costhow we detect it
Equipment stolen from the site over the weekend
$30K – $80KMXN per event + project delay
perimeter PIR + door logs + WhatsApp alert
Stand-by generator out of fuel during outage
$15K – $40KMXN per non-working day
fuel level + generator current monitoring
Inadequate climate in worker dormitories
turnover+ contractor reputation
T+RH sensor per dorm + ventilation alert
Broken cold chain in worker mess
$10K – $30KMXN per product-loss event
temperature per refrigerator + WhatsApp alert to field manager
Water leaks on site (finished surfaces destroyed)
$50K – $200KMXN product + delivery delay
leak sensors under critical equipment + finished work
>./recetas --pre-d2d·III · available today · without waiting for Q4 2026

the 7 recipes we already deploy on site.

Not every recipe depends on the D2D AC controller. These are ready to pilot today:

security● activa

nighttime PIR perimeter

sensors on the site perimeter + alert before theft

security● activa

critical-door aperture log

immutable log + alert on after-hours opens

fuel● activa

fuel tank level

anti-theft + reorder before running out of diesel

cold chain● activa

walk-in cooler

worker mess · cold chain + excursion alert

energy● activa

predictive generator maintenance

generator current analysis before failure

water● activa

leak detection

sensors under critical equipment + finished surfaces

security● activa

smoke + CO in dormitories

detector + alert to property manager + fire department

>./recetas --post-d2d·IV · coming with D2D · Q4 2026

occupancy-driven climate · coming soon.

When the D2D AC controller + IFT homologation land, we add:

Q4 2026

per-dormitory climate

Per-room thermostat in worker camps. HVAC switches off in empty dorms automatically.

Q4 2026

field-office pre-conditioning

Comfort scheduled by hour-of-day / day-of-week. The office is ready when the team arrives.

Q4 2026

pre-cooling for deliveries

Modular housing units arrive pre-conditioned the morning of handover. Reduces post-delivery complaints.

>./partners·V · how to work with AstreaIoT on cluster 3

three ways to work with us.

01

D2D partner · early access

HVAC installers, smart-home integrators, security integrators who spec hardware into projects. We train you on the platform + recipes; you close the deal with your end customer. Priority for Q4 2026.

02

spec-in early

For builders / developers who want monitoring built into projects closing in 2027+. We design the scope together so the first site delivers ready.

03

direct cluster 3

If your construction can wait for Q4 2026 + you have 5+ sites planned, you're a priority direct customer for launch.

>./engagement·VI · pricing model on launch

commercial model · when D2D lands.

per-site + per-recipe

You pay per active site, per deployed recipe. When the site finishes, it decommissions or moves to the next project.

per-developer subscription

For builders with N simultaneous projects. Fixed fee + recipes à la carte + cross-site dashboard.

redeployable hardware

Sensors designed to move between projects. CapEx amortizable across 3-5 projects over 4-7 yr useful life.

exact pricing published when Q4 2026 launches · early access has special terms

>./construccion --early-access● q4 2026

want to know when it ships · and what's available now.

Join the early-access list. We'll let you know when D2D launches and, if you have a project now, show you the 7 active pre-D2D recipes.