industrial tortillerías · every comal · every cold room · every minute.

For mid-format Mexican industrial tortillerías ($10M-$80M MXN/yr revenue): Maseca-supplied + Tortimasa + regional chains (Tortimax, Tortillería del Centro). Four fronts: 200-260°C gas LP comal/oven, masa cold storage (keep fresh), CFE GDMTO sub-metering, IAQ + LP gas detection + stored-grain humidity. NOM-187 tortilla + NOM-251 + NOM-005-STPS + CFE GDMTO compliance.

what is at stake
comal off-Tcomal 280°C instead of 240°C target · burnt masa · line stop · COFEPRIS audit
LP gas leakundetected LP gas leak · overnight accumulation · potential explosion + STPS investigation
masa cold storagewalk-in cooler masa fails · accelerated bacterial fermentation · entire day's batch lost + NOM-251
>./zonas·I · four critical zones · industrial tortillería

four zones · complete tortillería.

A Mexican mid-format industrial tortillería has four operational fronts: gas LP comal/oven with precise T, masa cold storage + raw materials (corn/MASECA), LP gas life-safety + plant IAQ, CFE GDMTO sub-metering + stored grain (aflatoxins in warehouse). AstreaIoT covers all four with the same platform.

01

200-260°C gas LP comal/oven

PT100 surface probe per comal or gas LP oven (typically 200-260°C cooking) · continuous log · alert if out of band · high-temperature probe. Compatible with flat comales (traditional chain) and modern rotary ovens (Tortimax / CIME).

02

masa cold storage + raw materials

T probe per masa walk-in cooler (target 4-7°C) + raw-materials cold room (refrigerated grains if applicable) · door sensor + compressor current meter · immediate WhatsApp alert if T rises. NOM-251 cold chain compliant.

03

LP gas detection + plant IAQ

Combustible gas detector in tank area and cooking line · immediate alert + automatic ventilation · STPS NOM-005 compliant. Multi-parameter T+RH+CO₂ sensor in operation zone · IAQ defended for workers.

04

CFE GDMTO sub-metering + stored-grain humidity

main-panel meter with 12 current channels + 3 voltages · per-line CFE sub-metering (cooking · refrigeration · packaging · stored grain). RH probes in corn silos/warehouse · preemptive aflatoxin if high RH + high T.

Out of scope: forming-cooking machine operation (that's your equipment manufacturer · typically CIME, Tomásito, Tortimax). Also not masa formulation — that's your nixtamalero. We integrate via Modbus with your PLC if it exists.

>./valor·II · the platform · against five concrete losses

what we protect · what we prevent.

what we protect
  • +Comal/oven with precise T · standard tortilla · backed NOM-187 audit
  • +Validated masa cold storage · cold chain compliant · NOM-251 + COFEPRIS without findings
  • +LP gas watched 24/7 · STPS compliant · explosion + accident avoided
  • +Per-line CFE GDMTO sub-metering · justified power factor · quantifiable savings
  • +Stored-grain humidity watched · preemptive aflatoxins · avoided raw-material loss
what we prevent
  • Comal 280°C summer without alert · burnt masa · line stop · lost shift · NOM-187
  • Walk-in masa fails overnight · masa at 18°C ambient · bacterial fermentation · entire batch discard · COFEPRIS
  • Undetected overnight LP gas leak · accumulation · ignition · explosion · lives + plant destroyed
  • 0.80 GDMTO power factor · invisible CFE penalty · capacitor bank without data
  • Aflatoxins in grain warehouse without alert · NOM-187 + NOM-247 compromise · fine + recall
>./casos·III · eight situations · four areas

eight use cases · four critical areas.

>./comal-oven·sección A

for the plant manager + nixtamalero.

Plant Manager + Nixtamalero + Line Operator. Two cases · summer overheated comal without alert, rotary oven with inconsistent T between zones. Quality + uptime.

#what happenshow we detectprotected value
01
Summer tortillería comal rises to 280°C · burnt masa · line stop + 2 lost shifts · pending COFEPRIS audit · NOM-187 compromise
comal surface PT100 probe + continuous log · WhatsApp alert to plant manager in minutes · burner adjustment + preventive stop
Defended shifts · standard masa · backed NOM-187 audit
02
CIME rotary oven with inconsistent T between zones (zone 1 at 240°C, zone 4 at 220°C) · tortillas with irregular cooking · mid-format customers complain
multi-zone PT100 probes + gradient dashboard · burner adjustment + balance · drift alert
Standard cross-zone quality · satisfied customers · defended brand reputation
>./masa-cold-storage·sección B

for the production lead + cold-chain lead.

Production Lead + Cold-Chain Lead + Operator. Two cases · long-weekend walk-in masa fails, raw-material cold room with door ajar. NOM-251 + daily batch.

#what happenshow we detectprotected value
03
Walk-in cooler masa fails Friday night · weekend masa at ambient temperature · Monday entire batch discarded · NOM-251 compromise
T probe + door sensor + compressor meter · immediate WhatsApp alert + backup generator activation if applicable
Saved masa · Monday batch fulfilled · clean NOM-251
04
Raw-material cold room with door ajar for hours by human error · cold chain compromised · day's pending batch at risk
door sensor + alert if open more than 5 min · alert to operator and manager
Defended cold chain · operation without losses · backed NOM-251
>./gas-lp-iaq·sección C

for the safety lead + STPS lead.

Safety Lead + STPS Lead + Plant Manager + Maintenance. Two cases · undetected overnight LP gas leak, plant IAQ with high CO₂ + inadequate ventilation. Life + STPS.

#what happenshow we detectprotected value
05
LP gas leak in overnight valve · slow accumulation in cooking zone · no alert until personnel enters at dawn · potential ignition
combustible gas detector + automatic ventilation activation + immediate alert + access blocking
Protected personnel · explosion avoided · STPS NOM-005 compliant · accident + investigation avoided
06
Tortillería plant IAQ with accumulated CO₂ + high humidity · workers with fatigue + headache · low productivity
multi-parameter T+RH+CO₂ sensor operation zone + alert + ventilation activation · STPS NOM-011
Workers with good air · stable productivity · STPS compliant
>./cfe-aflatoxins·sección D

for the CFO + supply-chain lead.

CFO + Supply-Chain Lead + Plant Manager. Two cases · low GDMTO power factor, high humidity in stored grain with aflatoxins. Costs + supply chain.

#what happenshow we detectprotected value
07
0.80 GDMTO power factor without per-line breakdown · invisible CFE penalty · capacitor bank without justification
main-panel meter with continuous power factor · CFO dashboard + monthly report · capacitor bank justification
Penalty avoided · capacitor bank approved with data · quantifiable annual savings
08
High humidity in stored-corn warehouse · preemptive aflatoxins · contaminated raw material · NOM-187 + NOM-247 compromise + potential recall
RH probes in silos/warehouse + alert if RH exceeds 14% + high T · preventive ventilation or drying
Preserved raw material · avoided aflatoxins · NOM-187 + NOM-247 compliant · avoided recall
>./noms·IV · regulations and compliance that apply

three compliances · one platform covers all three.

NOM-187-SSA1-SCFI · tortilla
what it requires
Nixtamalized masa products for tortillas + process logs + masa + raw-materials cold chain.
how we deliver
comal + masa cold storage T probes + automated log + monthly report for COFEPRIS.
NOM-251 + NOM-005-STPS
what it requires
Hygienic practices + chemical safety (LP gas) + labor conditions.
how we deliver
T probes + LP gas sensor + IAQ + alert + quarterly STPS report.
NOM-247-SSA1 (aflatoxins) + CFE GDMTO
what it requires
Aflatoxins in stored grains (zero/restricted) + electrical-usage transparency.
how we deliver
stored-grain RH probes + CFE sub-metering + power factor + CFO dashboard.

For multi-site tortillería chains (Tortimax, Tortillería del Centro), cross-property dashboard with compliance ranking + consolidated CFE sub-metering.

>./workflow·how the data travels

from sensor to report · every five minutes · without human intervention

Five steps. They run in parallel across all your sites, all the time. When something crosses a threshold, the flow completes in under five minutes — alert delivered, response logged, inspector-ready evidence captured.

01

measure

Sensors measure temperature, humidity, current, door-open, leak and other magnitudes every five minutes — no operator required.

02

detect

The system compares each reading against the threshold configured per recipe · per site · per equipment. Threshold crossing triggers the flow.

03

alert

The alert routes to the right person via WhatsApp, email or push · per role and schedule configured.

04

respond

The operator acts from the dashboard or mobile app. The corrective action goes into an immutable log with timestamp + signature.

05

audit

Everything becomes part of the audit package · time series, critical events, corrective actions, NOM report ready in two clicks.

Five steps · no manual operators · no paperwork · no gaps.

>./despliegue·V · five phases · from kickoff to first auditable batch

five phases · per tortillería.

01

site survey + plant plan

1-2 days

Technical visit + inventory of comales/ovens, walk-in masa, raw-materials cold rooms, LP gas tanks, CFE panel, corn warehouse · deployment plan.

02

physical installation

2-4 days

Comal-surface PT100 probes + walk-in masa T probes + LP gas sensor + multi-parameter IAQ sensor + CFE meter + warehouse RH probes · gateway with backup · without affecting production.

03

configuration + PLC integration

1-2 weeks (includes Custom L3 if your plant has PLC)

Per-product comal thresholds + LP gas alerts + cold chain + sub-metering · NOM-187 + COFEPRIS report templates · Modbus PLC integration.

04

team training

1 day

Plant Manager + Nixtamalero + Cold-Chain Lead + Safety Lead + CFO + Operators · each role trains on their flow.

05

30 days of support + first audit

30 days

AstreaIoT specialist available · first monthly report with comal + masa + LP gas + sub-metering + aflatoxins · first backed NOM-187 audit.

For multi-site tortillería chains, per-plant deployment with standardized BOM.

>./faq·VI · common questions before the quote

common questions · before the quote.

does it integrate with my forming-machine PLC?

Yes · Custom Integration L3 · Modbus TCP or RTU with your PLC (CIME, Tomásito, Tortimax). Comal + cold chain + sub-metering data feeds your central system.

does the PT100 probe continuously withstand comal T?

Yes · temperature probe (operational 200-280°C, peaks up to 500°C) · refractory + resistant cable. Calibrated in accredited laboratory.

what about LP gas detection?

Gas detector in tank area + cooking line · immediate alert + automatic ventilation activation + optional access blocking. STPS NOM-005 compliant. Your personnel protected 24/7.

are NOM-187 + NOM-247 (aflatoxins) audits backed?

Yes · pre-configured templates for NOM-187 tortilla + NOM-247 aflatoxins + monthly report with comal + cold chain + sub-metering + warehouse RH · COFEPRIS your Responsable Sanitario hands the evidence packet to the auditor.

how is pricing for a mid-format tortillería?

Per-line model: SaaS fee per comal/oven + masa walk-in + life-safety + sub-metering + grain warehouse. Approximately between several thousand and a few thousand pesos monthly depending on scale. 90-day Hybrid Pilot default.

does it integrate with tortillería chains (Tortimax, Tortillería del Centro)?

Yes · cross-property dashboard + compliance ranking + consolidated sub-metering · ideal for corporate with multi-site.

are premium-supplier certifications (Walmart-supplier, supply chain) backed?

Yes · inspector-ready report aligned with large-chain expectations (Walmart, Soriana, HEB) · sub-metering + cold chain + LP gas defensible vs supply chain audit.

>./roi·VII · why this is good business

every comal · every batch · every shift.

~ $200K-$700K MXN/year per tortillería
approximately · protected value per mid-format industrial tortillería · multi-site chains (Tortimax network) = between one and three million pesos annually

For a Mexican mid-format industrial tortillería ($10M-$80M MXN/yr revenue), annual ROI concentrates in four lines: shifts defended by monitored comal (one shift = tens of thousands of pesos), validated masa cold storage (backed cold chain), LP gas life-safety (avoided explosion + accident), CFE sub-metering + aflatoxins (power factor + preserved raw material).

For multi-site chains, ROI multiplies with cross-property dashboard + consolidated procurement.

The decision for an industrial tortillería is not whether to invest; it is when to start the pilot in the anchor comal to accumulate ROI before the next recurring COFEPRIS audit.

>./request-quote --vertical=tortillerias-industriales

your tortillería · every comal, every batch.

Thirty minutes. You tell us your capacity (tons/day), number of comales/ovens, walk-in masa, whether you buy Maseca or work with direct corn. We deliver a quote + deployment plan + projected ROI + evidence snapshots for inspector for NOM-187.