ACERMEX · NOM-142 · STPS

craft breweries · every fermenter · every tank · every batch.

For Mexican craft breweries (micro and craft brewers in the ACERMEX network). Four fronts: precise 18-22°C fermentation, tank-cellar CO₂ life-safety, kegs/bottles cold rooms + raw-material cold storage, steam boiler + CFE GDMTO sub-metering. NOM-142 beer + NOM-251 + STPS + CFE GDMTO.

what is at stake
failed fermentationtank out of 18-22°C · entire 10-20 hL batch compromised · weeks of lost production
CO₂ life-safetyaccumulation in fermentation cellar · personnel exposed · NOM-010-STPS-2014 compromised + potential death
kegs cold roomswalk-in cooler fails · packaged inventory at ambient temperature · flavor + freshness compromised
four critical zones · craft brewery

four zones · complete brewery.

A Mexican craft brewery has four operational fronts: precise per-tank fermentation, tank-cellar CO₂ life-safety, cold chain for packaged product + raw materials (refrigerated hops), brewhouse energy/steam + CFE GDMTO sub-metering. AstreaIoT covers all four with the same platform.

01

precise 18-22°C per-tank fermentation

submersible or surface T probe per fermenter (4-20 tanks typical) · continuous fermentation curve log · WhatsApp alert to master brewer if outside ±0.5°C range. Compatible with conical isobaric tanks (glycol jacket); your PLC keeps driving the glycol valve, we alert you.

02

CO₂ life-safety cellar + brewhouse

multi-parameter sensor with CO₂ per fermentation room + cellar + brewhouse. An alert so your team ventilates + immediate alert when CO₂ rises to 1500 ppm (warning) / 5000 ppm (immediate evacuation). Every alarm is logged: the record that backs your chemical-agent assessment (NOM-010-STPS-2014).

03

kegs/bottles cold rooms + raw materials

T probe per walk-in cooler of packaged product (kegs / bottles / cans / refrigerated hops). Door sensor + compressor current meter: alerts you when the compressor’s consumption changes. WhatsApp alert if T rises out of range.

04

steam boiler + CFE GDMTO sub-metering

T probe in steam boiler (95-100°C wort boiling + 80°C sanitization). Three-phase meter on the main panel · per-production-line sub-metering (brewhouse · fermentation · packaging · cold storage). Time-stamped power factor so you decide with data.

Out of scope: brewhouse process control (already in your PLC system). Also no recipes / formulations — that's your master brewer. We integrate with your PLC via Modbus if relevant.

the platform · against five concrete losses

what we protect · what we prevent.

what we protect
  • +Precise 18-22°C fermentation · defended aromatic profile · batches without T-drift defects
  • +CO₂ life-safety watched 24/7 · safe personnel · NOM-010-STPS-2014 assessment backed
  • +Validated kegs/bottles cold storage · defended freshness · protected brand reputation
  • +Steam boiler + CFE sub-metering · power factor in view · consumption per line
  • +Backed NOM-142 beer compliance · COFEPRIS inspection with a complete log · defensible brand narrative ("every tank monitored")
what we prevent
  • ✕Fermenter out of range 4h overnight · 10-20 hL batch compromised · weeks of lost production
  • ✕CO₂ accumulated in cellar · personnel exposed · STPS accident + investigation + possible death
  • ✕Walk-in kegs fails weekend · complete inventory at ambient temperature · brand reputation crisis
  • ✕Low power factor in GDMTO · invisible CFE penalty · no data to decide on a capacitor bank
  • ✕COFEPRIS audit without continuous log · NOM-142 compromise · fine + temporary closure
eight situations · four areas

eight use cases · four critical areas.

for the master brewer + production lead.

Master Brewer + Production Lead + Cellar Manager. Two cases · tank off-range during main fermentation, missed dry-hop window. Aromatic profile + yield.

#what happenshow we detectprotected value
01
IPA fermenter overnight drift from 19°C to 24°C · uncontrolled esters · batch flavor off-profile
tank T probe + continuous log · WhatsApp alert to master brewer when exceeding +0.5°C (the sensor reports every few minutes)
Aromatic profile defended · 15 hL batch saved · recipe replicable without defect
02
Dry-hop 72h window forgotten · hop exposed too long · beer too bitter · batch compromised
T probe + continuous time-stamped log · each batch curve is recorded; your team tracks the 72h count with that record
Batch curve documented · every stage in view · brand consistency defended

for the safety lead + plant manager.

Safety Lead + Plant Manager + STPS Lead. Two cases · overnight CO₂ accumulation in fermentation cellar, failed brewhouse ventilation event. Life-safety + STPS.

#what happenshow we detectprotected value
03
CO₂ accumulated in fermentation cellar with 12 active tanks · personnel enters at dawn · exposed above 5000 ppm · asphyxiation risk
multi-parameter CO₂ sensor · an alert so your team ventilates at 1500 ppm + immediate alert + do-not-enter alert
Protected personnel · record for your NOM-010-STPS-2014 assessment · accident avoided · investigation + fine + possible manslaughter avoided
04
Brewhouse ventilation fails during 95°C boil · steam + CO₂ accumulated · operator exposed · no alert
multi-parameter T + humidity + CO₂ brewhouse sensor · immediate alert to operator + manager so your team ventilates
Protected operators · documented event · root-cause investigation backed

for the cellar manager + packaging lead.

Cellar Manager + Packaging Lead + Logistics Lead. Two cases · long-weekend walk-in kegs fails, refrigerated hop exposed to ambient temperature. Cold chain + freshness.

#what happenshow we detectprotected value
05
Walk-in cooler kegs fails Friday night · Saturday-Sunday complete inventory at 18°C · Monday brand crisis
T probe + door sensor + compressor current meter · immediate WhatsApp alert so your team acts
Saved inventory · defended freshness · protected brand reputation · Monday orders fulfilled
06
Refrigerated hop in cold room exposed to 25°C overnight by human error (door ajar) · volatilized oils · subsequent brewhouse batches with less aroma
door sensor + T probe + alert to cellar manager if door open more than 5 min
Protected hops · recipes with consistent aroma · brand quality defended

for the CFO + plant engineer.

CFO + Plant Engineer + Commercial Manager. Two cases · low power factor in GDMTO, steam boiler with deteriorated efficiency. Energy + costs.

#what happenshow we detectprotected value
07
Power factor 0.82 in GDMTO during operation · invisible CFE penalty · no data to decide on a capacitor bank
three-phase meter on the main panel with continuous power factor · time-stamped history for the CFO
Penalty in view · the capacitor bank decision is made with data
08
Steam boiler with deteriorated efficiency · growing LP gas consumption · no clear diagnosis
boiler T probe + pump current meter · alerts you when the pump’s consumption changes or the temperature leaves its range
Timely maintenance · review backed by temperature and consumption data
regulations and compliance that apply

three compliances · one platform covers all three.

NOM-142-SSA1-SCFI · beer
what it requires
Bottled alcoholic and non-alcoholic beverages: sanitary specifications + labeling + process control.
how we deliver
fermentation + cold storage T probes · the time-stamped temperature record NOM-142 asks for in a COFEPRIS inspection.
NOM-251-SSA1 · hygiene practices
what it requires
Hygienic practices in food/beverage production + raw-materials cold chain + finished-product cold storage.
how we deliver
cold room T probes + door sensors + log that can’t be edited + temperature report.
NOM-010-STPS-2014 + NOM-005 + CFE GDMTO
what it requires
Personnel safety (CO₂ life-safety + NOM-005 chemistry) + electrical-usage transparency (GDMTO).
how we deliver
CO₂ sensor + alert so your team ventilates + CFE sub-metering + power factor · STPS + CFE compliance.

For multi-site craft breweries, cross-property dashboard with compliance ranking + consolidated CFE sub-metering.

>./workflow·how the data travels

from sensor to report · every few minutes · without human intervention

Five steps. They run in parallel across all your sites, all the time. When something crosses a threshold, the flow completes in under five minutes — alert delivered, response logged, inspector-ready evidence captured.

01

measure

Sensors measure temperature, humidity, current, door-open, leak and other magnitudes every few minutes — no operator required.

02

detect

The system compares each reading against the threshold configured per recipe · per site · per equipment. Threshold crossing triggers the flow.

03

alert

The alert routes to the right person via WhatsApp, email or push · per role and schedule configured.

04

respond

The operator acts from the dashboard or mobile app. The corrective action goes into a timestamped log with signature, which can’t be edited.

05

audit

Everything becomes part of the audit package · time series, critical events, corrective actions, NOM report ready in two clicks.

Five steps · no manual operators · no paperwork · no gaps.

five phases · from kickoff to first monitored batch

five phases · per brewery.

01

site survey + brewery plan

1-2 days

Technical visit + inventory of fermenters (4-20 typical), tank cellar, walk-in coolers, boiler, CFE panel · deployment plan with fermentation + life-safety emphasis.

02

physical installation

2–7 days per site

Per-fermenter T probes + multi-parameter CO₂ sensor + walk-in cooler probes + CFE three-phase meter · gateway with backup · without affecting production (between-batches installation).

03

configuration + PLC integration

1-2 weeks (includes Custom L3 if your brewhouse has Modbus PLC)

Fermentation thresholds per beer style + CO₂ alerts (warning/danger) + Modbus integration with brewhouse PLC as a project · the temperature record NOM-142 asks for.

04

team training

1 day

Master Brewer + Production Lead + Safety Lead + Cellar Manager + CFO + Plant Engineer · each role trains on their flow.

05

30 days of support + first audit

30 days

AstreaIoT specialist available · first monthly report with fermentation + life-safety + cold storage + sub-metering · first 100% monitored batch.

For multi-site breweries, per-site deployment with standardized BOM.

common questions before the quote

common questions · before the quote.

does it integrate with my brewhouse PLC system?

As a project · connection built as a project · Modbus TCP or RTU with your PLC (Siemens S7, Allen-Bradley, Schneider). Fermentation + cold storage + sub-metering data feeds your central system. Integration time 2-4 weeks first time · reusable for future expansions.

what precision do the fermentation probes have?

Precision submersible T probes · each probe arrives with its factory calibration report. Surface probes sufficient for tanks with good thermal conduction. The submersible is default for critical fermentation.

what about CO₂ life-safety in cellar with many tanks?

Multi-parameter CO₂ sensor per cellar (the count is set in the site survey) · an alert so your team ventilates at 1500 ppm + immediate alert + do-not-enter alert for the cellar. Every alarm is logged: the record that backs your chemical-agent assessment (NOM-010-STPS-2014). Your personnel protected 24/7.

are COFEPRIS audits for NOM-142 backed?

Yes · the time-stamped temperature record NOM-142 asks for + temperature and energy reports + exportable file · your Responsable Sanitario hands it to the auditor.

how is pricing for a 5-15 hL per-batch brewery?

Per-tank model: SaaS fee per fermenter + cold storage + life-safety + sub-metering. Approximately between hundreds and a few thousand pesos monthly depending on number of tanks + cold rooms + sub-metering. 15–30-day Hybrid Pilot default.

is the "every batch monitored" brand narrative backed?

With data, yes · each tank’s fermentation history is kept 5 years and you export it to show your customers and distributors.

does it integrate with ACERMEX marketplace or network reports?

As a project · the platform sends signed events to other systems; the link to ACERMEX or other networks we build with you as a project.

what is at stake

every fermenter · every batch · every year.

~ $300K-$800K MXN/year per brewery
approximately · protected value per mid-format craft brewery · multi-site breweries = between one and three million pesos annually · illustrative example

For a Mexican mid-format craft brewery (8-15 hL per batch, 4-20 fermenters), annual protected value concentrates in four lines: batches saved by monitored fermentation (one rescued batch pays the system for months), CO₂ life-safety (avoided event = lives + STPS investigation), validated cold storage (freshness + brand reputation), CFE sub-metering (power factor + consumption per line).

For multi-site breweries (across several states, or with production + branches), protected value multiplies with cross-property dashboard + consolidated procurement.

The decision for a craft brewery is not whether to invest; it is when to start the pilot in the anchor fermenter to accumulate protected value before the next batch or event.

your brewery · every tank, every batch.

Thirty minutes. You tell us your capacity (hL per batch), number of fermenters, walk-in coolers, whether you have a PLC in the brewhouse, whether you belong to ACERMEX. We deliver a quote + pilot deployment plan + what is at stake with your numbers.