>./industrias·56 industries · 10 packages
see all industries
>./industries/industrial/maquila·cluster 03 · STPS · CFE GDMTO · USMCA export client

multi-shift measured · per-area PF · export client with continuous data.

An electronics/textile/automotive Tier 2-3 maquila with USMCA export client (US/Canada/Mexico) has ESG exposure: the client auditor demands a monthly report of energy, IAQ and operating hours per line and per shift. One platform covers all four zones — per-shift efficiency, per-area PF, particulate control and generator always ready.

what's at stake
export auditUSMCA client demands continuous monthly ESG report
inefficient shiftshift 2 vs 1 with 15% less efficiency · invisible without sub-metering
ESD particulateelectronics with out-of-range PM2.5 invalidates whole lot
>./puntos·point by point

this is how we look after your plant, from the inside.

Each number is a point where a wireless sensor works for you — and the specialist tells you what to do. You install only the ones that apply to your plant. The color says what each one protects:

filter:
your plant · over the planisometric map of an industrial plant
1critical motorwe detect motor wear 2–4 weeks before the failure
2air compressorwe detect an internal leak before it spikes your air consumption
3compressed-air linewe alert you to the air leaks you're paying for on the power bill
4main panelwe alert you before CFE penalizes you for demand or power factor
5production sub-panelwe show you how much energy each shift and each part consumes
6production floor · STPSwe log heat, CO₂ and noise for your STPS record
7electrical roomwe detect panel overheating before the fire
8machine roomwe alert you to a water leak under pumps and equipment
9temperature processwe alert you if the process drifts out of spec, before the scrap

★ the specialist crosses signals. The motor current signature (1) reveals bearing wear 2–4 weeks ahead —without touching the equipment—; and the compressor current (2) against the line pressure (3) betrays an internal leak. It all feeds your STPS log, ready for the inspector.

>./valor·II · the sensor is the cheapest investment · against five concrete losses

what we protect · what we prevent.

what we protect
  • +kWh-per-unit efficiency per shift and line · shift 2 less efficient than shift 1 visible
  • +Monthly ESG report for USMCA export client · zero manual entry
  • +Per-area PF · capacitor bank localized where it hurts · approximate payback in 3-6 months
  • +Documented ESD particulate control · electronics lots protected
  • +Generator always ready · multi-shift 24/7 without blackout downtime
what we prevent
  • Export client cancels contract from ESG report without continuous data
  • Permanent CFE GDMTO surcharge from low PF in specific areas without sub-metering
  • Invisible inefficient shift 2 · 9-15% more kWh per unit without diagnosis
  • Whole electronics lot rejected from out-of-range PM2.5
  • Multi-shift downtime from generator not started · export client with broken SLA
>./casos·III · ten situations · four areas

ten use cases · four critical areas.

>./multi-shift-efficiency·sección A

for the plant manager.

Plant Manager + Operations Director. Three cases · shift 2 less efficient than shift 1 without data, kWh-per-unit varies 15% between similar lines, maintenance by fixed calendar instead of real hours. main-panel meter sub-metering per line.

#what happenshow we detect itprotected value
01
Shift 2 less efficient than shift 1 · no diagnosis
main-panel meter sub-metering per line · kWh-per-unit analysis per shift
Efficiency difference visible · data-driven staffing and training
02
kWh-per-unit varies 15% between similar lines
main-panel meter per line + MES correlation · cross-line benchmarking
Least efficient line identified · focused intervention
03
Maintenance by fixed calendar instead of real hours
Real operating-hours counter per line · threshold alert
Data-driven maintenance · zero premature or late maintenance
>./per-area-pf·sección B

for the CFO and energy director.

CFO + Energy Director. Two cases · low power factor in specific areas without sub-metering, peak demand near contracted limit in peak shifts. CFE GDMTO with localized analysis.

#what happenshow we detect itprotected value
04
Low PF in specific areas · no sub-metering · inefficient generic bank
Three-phase meter per sub-panel · per-area PF analysis
Localized capacitor bank · approximate payback in 3-6 months
05
Peak demand near contracted limit in peak shifts
Three-phase meter alerts at 90% of contracted capacity
Overrun surcharges avoided · data-driven load management
>./esd-particulate·sección C

for the quality director and export client.

Quality Director + USMCA export-client auditor. Three cases · electronics assembly zone with out-of-range PM2.5, ESD-controlled out of spec, export audit demands monthly ESG report. Documented particulate control.

#what happenshow we detect itprotected value
06
Out-of-range PM2.5 in electronics assembly zone
Continuous PM2.5 / PM10 / VOC sensor · limit alert
Electronics lot protected · zero contamination rejection
07
ESD-controlled out of spec (humidity or temperature)
Continuous temperature + humidity sensor in ESD zone
Electronics assembly in spec · export client retained
08
USMCA export audit demands monthly ESG report
Dashboard with operational metrics + IAQ + energy · monthly report
ESG-ready · export client retained · USMCA contract protected
>./continuity-24-7·sección D

for the multi-shift operations director.

Multi-Shift Operations Director + Safety Officer. Two cases · generator does not start on blackout (multi-shift with export client), surprise STPS audit with log full of gaps. 24/7 continuity documented.

#what happenshow we detect itprotected value
09
Generator does not start on blackout · multi-shift with export client
Generator current meter + diesel sensor + room temperature sensor · critical UPS
Generator always ready · export client always covered
10
Surprise STPS audit with log full of gaps
CO₂ + temperature + noise sensor per zone · continuous record
NOM-015 + NOM-011 compliance · STPS audit backed by data
>./noms·IV · regulations and audits that apply

three compliances + export audit · one platform covers all.

USMCA Export-Client Audit
what it requires
Continuous monthly ESG report · energy + IAQ + operating hours + ESD-controlled · per-lot traceability · English documentation.
how we deliver
Bilingual dashboard · downloadable monthly ESG report · per-export-client template · audit backed by continuous data.
NOM-015-STPS + NOM-011
what it requires
Thermal and noise conditions in multi-shift production zones · >35 °C = heatstroke risk.
how we deliver
CO₂ / PM2.5 / VOC + temperature + noise sensor per zone and shift · continuous record.
CFE GDMTO
what it requires
Industrial tariff with demand charge + PF ≥0.85 · per-area surcharges.
how we deliver
Three-phase meter + per-area sub-metering + localized PF analysis.

24/7 multi-shift with USMCA export client — bilingual dashboard and ESG report ready for North American client audit.

>./workflow·how the data travels

from sensor to report · every five minutes · without human intervention

Five steps. They run in parallel across all your sites, all the time. When something crosses a threshold, the flow completes in under five minutes — alert delivered, response logged, inspector-ready evidence captured.

01

measure

Sensors measure temperature, humidity, current, door-open, leak and other magnitudes every five minutes — no operator required.

02

detect

The system compares each reading against the threshold configured per recipe · per site · per equipment. Threshold crossing triggers the flow.

03

alert

The alert routes to the right person via WhatsApp, email or push · per role and schedule configured.

04

respond

The operator acts from the dashboard or mobile app. The corrective action goes into an immutable log with timestamp + signature.

05

audit

Everything becomes part of the audit package · time series, critical events, corrective actions, NOM report ready in two clicks.

Five steps · no manual operators · no paperwork · no gaps.

>./despliegue·V · five phases · from kickoff to first ESG report

five phases · per plant.

01

site survey per plant

1-2 days

Technical visit + inventory of lines, sub-panels, electronics assembly zones, generator · STPS checklist · export-client ESG requirements identification.

02

physical installation

4-5 days

main-panel meter per sub-panel · current meter per critical line + PM/temp/humidity sensors in ESD zones + generator + panel three-phase meter · no operational shutdown · multi-shift available.

03

configuration + calibration

2 days

Per-area + per-shift thresholds · baseline learned in 5-7 days · per-export-client ESG template (Spanish + English) · WhatsApp alerts per role.

04

team training

1 day

Plant Manager + Operations Director + Quality Director + Energy Director · each role trains on their flow.

05

30 days of support + first export audit

30 days

AstreaIoT specialist available · first monthly ESG report delivered · first export-client audit backed by continuous data.

For multi-plant maquila: after the first pilot plant, phases compact to 10-14 days per plant.

>./faq·VI · common questions before the quote

common questions · before the quote.

is the ESG report in Spanish or English?

Both · bilingual dashboard and report exportable in Spanish or English · pre-configured templates for USMCA clients. Custom Integration available if your client has a specific ESG template.

does it integrate with the plant MES or ERP?

Yes · via Custom Integration. We connect you to SAP, Oracle, Microsip, proprietary MES or a custom system. Operating-hours, energy and traceability data arrive directly in your central system.

does it work with electronics, textile and automotive lines?

Yes · sensors are external (main-panel meter per sub-panel, current meter per line, ambient sensors per zone) and mount in any configuration · without touching process control · without operational shutdown.

how are PM and ESD sensors calibrated?

Sensors calibrated in an accredited laboratory before deployment. Validity tracked per equipment in the dashboard. Recalibration every 12 months · we keep the calendar.

what happens if the plant internet goes out?

The gateway has 32-hour backup and local buffer. Sensors keep recording · everything syncs on reconnect. Included cellular backup takes over if the outage prolongs.

does the system measure efficiency per individual shift?

Yes · main-panel meter sub-metering per line + correlation with MES or manual shift register · kWh-per-unit-produced per shift visible. Identifies shift 2 less efficient than shift 1 with data.

what happens if a new line is added or relocated?

Sensors are portable · removed and mounted on the new line or zone in 30 minutes. The system automatically maps the new assignment. No penalty or fee.

>./roi·VII · why this is good business

export client · ESG-ready.

USMCA · ESG
export client retained · monthly audit backed

For multi-shift maquila with USMCA export client, the monthly ESG audit demands continuous metrics for energy, IAQ and operating hours per line and per shift · per-lot traceability · English documentation. Without AstreaIoT, 12-20 hours of manual entry per audit.

The winning argument is export-client retention: the bilingual dashboard and the downloadable monthly ESG report convert a multi-hour audit into three minutes. Per-line and per-shift sub-metering makes shift efficiency differences visible · data-driven staffing and scheduling.

The decision is not whether to invest; it is how much it costs not to when the export client demands continuous ESG evidence before renewing the USMCA contract.

>./request-quote --vertical=maquila

the next export audit · is already backed.

Thirty minutes. You tell us how many plants you operate, how many lines and shifts, what type of maquila (electronics, textile, automotive) and what main export client you have. We deliver a per-plant quote + pilot plan + projected ROI with your data.