>./industrias·56 industries · 10 packages
see all industries
>./industries/public-sector/government-buildings·cluster 07 · LAASSP · ASF · audit

public buildings · measured operation · backed audit.

For federal, state, and municipal administrative offices, courts, and cultural centers in Mexico: continuous per-floor IAQ monitoring for staff and citizens, leaks in public bathrooms, auditable access (LAASSP), generator and operational continuity, CFE GDMTH sub-metering. One platform · ASF audit backed with data.

what's at stake
ASF auditpublic-building operational spending without documented evidence
business-hours incidentleak or failure with staff + citizens present
invisible CFE spendingpublic buildings typically without sub-metering · opaque budget
>./zonas·I · four critical zones · public operation with data

four zones · one dashboard per public building.

A public building (administrative office, court, museum, cultural center) has the same four fronts as a corporate AAA tower, plus specific requirements: verifiable IAQ for served citizens, auditable access before ASF, budget sub-metering, operational continuity for citizen services. AstreaIoT covers everything in one platform.

01

per-floor IAQ · citizens and staff

CO₂ / PM2.5 / VOC + temperature + humidity sensor per floor or public-service area. Post-COVID, citizens expect documented conditions. Monthly auditable report per public-service area.

02

leaks + infrastructure

Leak sensor under public bathrooms, kitchenettes, janitor rooms, electrical rooms. Temperature + humidity sensor in technical rooms. Elevators with current predictive analysis · zero "elevator stuck" with citizens.

03

auditable access · LAASSP

Door + bidirectional people counter sensors on critical access · immutable timestamp record for ASF audit. After-hours coverage · unauthorized event alerts.

04

energy + continuity

Billing-grade main-panel meter on main panel + sub-metering per agency or area · CFE GDMTH analysis. Generator with current meter + monitored diesel tank + critical UPS. Zero citizen-service outage from blackout.

Out of scope: active central HVAC control if the building has Niagara/Honeywell BMS (that remains the BMS). AstreaIoT adds granular coverage + billing + auditable access without touching the existing BMS when present.

>./valor·II · the platform · against five concrete losses

what we protect · what we prevent.

what we protect
  • +Verifiable IAQ per service area · staff + citizens with documented conditions
  • +Leaks detected in minutes · catastrophic cross-floor public-bathroom damage avoided
  • +Auditable access · ASF audit backed with continuous data
  • +CFE GDMTH budget sub-metering · transparent operational spending · justified capacitor bank
  • +Operational continuity with monitored generator · citizen service without blackout outage
what we prevent
  • ASF audit observations on undocumented operational spending · responsible officials
  • Public-bathroom leak during business hours · citizen slips · civil liability
  • Unauthorized access to archive or server without record · breach with legal consequences
  • Permanent CFE GDMTH surcharge · operational budget eroded without visibility
  • Citizen service interrupted by blackout · generator out of fuel or failure
>./casos·III · eight situations · four areas

eight use cases · four critical areas.

>./citizen-iaq·sección A

for the administrative director.

Administrative Director + Materials Manager. Two cases · insufficient IAQ in citizen-service area, out-of-range thermal conditions in work offices. STPS compliance + documented citizen experience.

#what happenshow we detect itprotected value
01
Insufficient IAQ in citizen-service area · complaints + recommendations
CO₂ / PM2.5 / VOC + temperature + humidity sensor per area · threshold alert
Documented conditions · complaints resolved with data · STPS + citizen experience
02
Work offices with out-of-range thermal conditions · functional turnover
Per-floor temperature + humidity sensor · data-driven diagnosis
HVAC adjustment without touching central BMS · staff in adequate conditions
>./leaks-infrastructure·sección B

for the maintenance lead.

Maintenance Lead + General Services Manager. Two cases · public-bathroom leak during business hours, elevator stuck with citizens. Continuous coverage without additional staff.

#what happenshow we detect itprotected value
03
Public-bathroom leak during business hours · citizen slips
Leak sensor under each public bathroom · immediate alert to services staff
Damage + civil liability avoided · documented immediate action
04
Elevator with mechanical failure · citizens stuck
current meter + machine-room temperature · predictive analysis
Preventive maintenance · zero "elevator stuck with citizens" · institutional image
>./access-asf·sección C

for the institutional security officer.

Institutional Security Officer + Internal Audit. Two cases · access to historical archive or server without reliable record, nighttime events in critical zones. ASF audit backed with immutable data.

#what happenshow we detect itprotected value
05
Access to historical archive or server room without record · ASF audit observes
Door + people counter sensor on critical access · timestamped record
ASF audit backed · documented responsibility · zero observations
06
Nighttime events in technical zones · vandalism or intrusion without detection
PIR + door sensor in non-operational zones · immediate alert to night guard or C5
Intrusion detected in minutes · vandalism prevented · institutional image
>./energy-continuity·sección D

for the institutional CFO and administrative director.

Institutional CFO + Administrative Director. Two cases · invisible CFE GDMTH spending without sub-metering, blackout interrupts citizen service. Transparent budget + documented continuity.

#what happenshow we detect itprotected value
07
Invisible CFE GDMTH spending · operational budget without per-agency granularity
main-panel meter + sub-metering per agency or service area · automatic PF analysis
Granular budget per area · capacitor bank justified · audit backed
08
Blackout interrupts citizen service · generator out of fuel or failure
current meter generator + diesel level sensor + generator-room temperature sensor
Generator always ready · citizen service without outage · institutional image defended
>./noms·IV · regulations and compliance that apply

three compliances · one platform covers all three.

ASF Audit · public operational spending
what it requires
Documented evidence of public-building operational spending · auditable access · per-agency traceability.
how we deliver
Immutable per-sensor log · per-agency sub-metering · monthly downloadable report · audit template.
NOM-011-STPS + NOM-018
what it requires
Thermal, noise, smoke/CO conditions in work zones · surprise STPS audits for staff.
how we deliver
CO₂ / PM / VOC + temperature + noise + smoke/CO sensor per zone · continuous record · automatic compliance.
CFE GDMTH · budget management
what it requires
Industrial tariff with demand charge + PF ≥0.85 · granular per-agency budget management.
how we deliver
main-panel meter + per-area sub-metering · automatic PF analysis · capacitor bank justified with data.

Procurement via LAASSP · multi-year contracts · award-eligible service per public organization. Cross-building dashboard for state or federal systems with multiple offices.

>./workflow·how the data travels

from sensor to report · every five minutes · without human intervention

Five steps. They run in parallel across all your sites, all the time. When something crosses a threshold, the flow completes in under five minutes — alert delivered, response logged, inspector-ready evidence captured.

01

measure

Sensors measure temperature, humidity, current, door-open, leak and other magnitudes every five minutes — no operator required.

02

detect

The system compares each reading against the threshold configured per recipe · per site · per equipment. Threshold crossing triggers the flow.

03

alert

The alert routes to the right person via WhatsApp, email or push · per role and schedule configured.

04

respond

The operator acts from the dashboard or mobile app. The corrective action goes into an immutable log with timestamp + signature.

05

audit

Everything becomes part of the audit package · time series, critical events, corrective actions, NOM report ready in two clicks.

Five steps · no manual operators · no paperwork · no gaps.

>./despliegue·V · five phases · from kickoff to backed ASF audit

five phases · per public building.

01

site survey + BMS review if exists

2-3 days

Technical visit + inventory of floors, service areas, bathrooms, electrical rooms, generator · sub-metering agency identification · existing BMS review if applicable.

02

physical installation

3-5 days

LoRaWAN sensors per floor, bathrooms, technical rooms + main-panel meter sub-metering per agency + gateway with 32-hour backup · overnight or weekend work · no citizen-service interruption.

03

configuration + audit templates

2 days

Per-area STPS thresholds · per-agency sub-metering · per-agency and ASF report templates · WhatsApp alerts configured per role.

04

team training

1 day

Administrative Director + Maintenance Lead + Institutional Security + CFO · each role trains on their alert and report flow.

05

30 days of support + first ASF audit

30 days

AstreaIoT specialist available · first monthly report delivered · first ASF audit backed with data · procedure validation.

For public organizations with multiple buildings (state, federal systems), cross-building dashboard with regional executive view.

>./faq·VI · common questions before the quote

common questions · before the quote.

is the contract awarded via LAASSP?

Yes · AstreaIoT can participate in federal, state, or municipal LAASSP procurement. Platform + capability + projected ROI documentation available. Multi-year contracts supported (up to 5 years).

is staff and citizen privacy respected?

Zero cameras. Only ambient sensors (CO₂, T, H, aggregated per area) + binary sensors (motion yes/no, door open/closed, aggregated occupancy). Complies with LFPDPPP. Personal data not captured.

does it integrate with federal administrative systems (CompraNet, SICOP)?

Yes · via Custom Integration. Metering and operations data arrive at the central system. Compatible with SICOP, CompraNet, and proprietary state systems.

what if the building already has Honeywell or JCI BMS?

AstreaIoT complements the existing BMS · does not replace it. Via BMS integration gateway bridge, LoRaWAN data arrives at the BMS supervisor without reconfiguration. If there is no BMS, AstreaIoT is the primary platform.

can it be billed as operational service or as CapEx?

Both models available · CapEx (organization buys hardware + SaaS subscription) or multi-year operational service (hardware + platform + support as integrated service). Adapted to the organization's budget.

is the ASF audit report pre-formatted?

Yes · pre-configured templates for ASF audits + internal control audits. Downloadable PDF with immutable timestamp · per-audit-type templates (financial, operational, environmental).

what if an agency relocates within the building?

Sensors are portable · removed and mounted at new location in 30 minutes. The system automatically maps the new agency · sub-metering reassigned without losing history.

>./roi·VII · why this is good business

audit backed · transparent budget.

ASF · backed
continuous audit · per-agency granular spending · immutable access · zero observations

For a public building (federal, state, municipal), the ROI is the combination of ASF audit backed with data + operational CFE cost reduction with sub-metering + institutional image protection against incidents (leak, blackout, intrusion). One platform covers all three fronts.

The winning argument for the public organization is budget transparency: the institutional CFO sub-meters per agency, the administrative director documents access, the internal auditor has data for ASF. Procurement via LAASSP with multi-year contract · predictable budget.

The decision is not whether to invest; it is how much it costs not to when the next ASF observation arrives for undocumented operational spending or the next business-hours incident with citizens present.

>./request-quote --vertical=government-buildings

your public building · measured and auditable.

Thirty minutes. You tell us what building you operate (administrative office, court, museum), how many floors and agencies, what upcoming ASF audit worries you. We deliver a quote + LAASSP procurement plan + audit strategy.